English
简体中文
Français
Pусский
Español

Home / Project&Reference

PROJECT&REFERENCE

  • Cryogenic centrifugal pump skids with flow rate of 48m3/h and head of 70M have been successfully completed in our factory. These ten sets of cryogenic centrifugal pump skids have been meticulously designed and meticulously crafted to cater to the unique needs of our esteemed customers.
  • Recently, the 15TPD liquid air separation plant provided by CYY Energy to European customers has been successfully delivered.
  • An Air Separation Plant (ASP) is a unit used to separate atmospheric air into its various components, mainly nitrogen, oxygen and argon. The process involves cooling the air until it liquefies, then gradually warming it up to allow for the separation of these gases based on their boiling points.
  • CYY Energy has successfully completed the production of skid mounted nitrogen plant CYY ENERGY provides Shanghai Tesla super factory project and Maanshan high nitrogen project for well-known gas companies in Shanghai. Container skid-mounted purifiers and air pressure systems have successfully comple
  • In August, nine 5000nm3 / h air ambient vaporizers manufactured by CYY for Taiwan's famous electronic manufacturing enterprises were successfully delivered. Within only two months after signing the contract, all vaporizers have been manufactured and passed the test with the best efforts of our produ
  • Project Name: Project of Gas Filling System for Thailand Customer;Project Date: December 17th,2021;The automated gas filling system ordered by the Thai customer has been finished.
  • VPSA Project

    2021-08-22
    Project Name: VPSA Project;Project Date: August 22th,2021 ;
    The VPSA Oxygen Generator has been installed for our customer.
  • ISO Tank Project

    2021-08-22
    Project Name: ISO Tank Project;Project Date: August 22th,2021;Two ISO tanks were shipped to our customers in Southeast Asia.