We have been committed to a one-stop solution for low rise prefabricated houses. Service range from architectural design, production, storage and transportation to installation guidance, after-sales service, etc. We have been committed to a one-stop solution for low rise prefabricated houses. Service range from architectural design, production, storage and transportation to installation guidance, after-sales service, etc. 

Case Classification

  • Cryogenic Centrifugal Pump Skids with 48m3/h Flow And 70M Head
    Cryogenic centrifugal pump skids with flow rate of 48m3/h and head of 70M have been successfully completed in our factory. These ten sets of cryogenic centrifugal pump skids have been meticulously designed and meticulously crafted to cater to the unique needs of our esteemed customers. Read More
  • CYY Energy 15TPD Air Separation Plant Delivery
    Recently, the 15TPD liquid air separation plant provided by CYY Energy to European customers has been successfully delivered. Read More
  • What Is an Air Separation Plant?
    An Air Separation Plant (ASP) is a unit used to separate atmospheric air into its various components, mainly nitrogen, oxygen and argon. The process involves cooling the air until it liquefies, then gradually warming it up to allow for the separation of these gases based on their boiling points. Read More
  • Skid Mounted Nitrogen Plant-CYY ENERGY
    CYY Energy has successfully completed the production of skid mounted nitrogen plant CYY ENERGY provides Shanghai Tesla super factory project and Maanshan high nitrogen project for well-known gas companies in Shanghai. Container skid-mounted purifiers and air pressure systems have successfully comple Read More
  • Nine sets of large vaporizers (5000Nm3/h) manufactured by CYY have been successfully finished and delivered.
    In August, nine 5000nm3 / h air ambient vaporizers manufactured by CYY for Taiwan's famous electronic manufacturing enterprises were successfully delivered. Within only two months after signing the contract, all vaporizers have been manufactured and passed the test with the best efforts of our produ Read More
  • Project Of Gas Filling System For Thailand Customer
    Project Name: Project of Gas Filling System for Thailand Customer;Project Date: December 17th,2021;The automated gas filling system ordered by the Thai customer has been finished. Read More
  • Total 3 pages  Go to Page
  • Go
  • Air Separation PSA Plant Cryogenic Tank suppliers logo
  • To Be The Best Gas And Engineering Corporation.
  • get ready for the future
    sign up for our newsletter to get updates straight to your inbox
    Subscribe